Scheduling Agreement In Sap Apo

12 avr Scheduling Agreement In Sap Apo

Improvements are available in the R/3 and the APO for the re-edming of delivery stations (incoming and outgoing transformations). 6) If your adjustment setting is a periodic transfer, run /sapapo/c5 t-code to send changes to the delivery plans, then save the APO. How are APO planning stations released from the ECC? Isn`t standard « Pulbication of the Result of Planning » Has anyone worked for the calendar agreement scenario in the APO? But when I look at the ECC, I don`t see the schedules agreeing. Currently, I plan in APO (SCM 5.1) and I have an appointment (type – APO Sch. Agree.) – The date of release of the lines works in a different way from the purchase request in the APO. I tested with the req purchase and it was immediately transferred to ECC. My question is: We have a report – to publish (transaction – /SAPAPO/PWBSCH1) to unlock the appointment agreement, so I think for the thought plan that we have to use the above transaction. 5) Check if the integration model for the delivery plan is active (with CFM5 t-code in R/3) I have kept the sharing profile and seems to be properly maintained. . .

. spro > sap implementation guide > integration with other components mySAP.com > increased planning and optimization > application-specific settings and extensions > extensions for distribution planning agreements. 2) Check if inconsistencies in running CCR report if I might have missed steps or a setup that I might have missed. . 1) The publication of the result of the planning should be put on instant transmission for ECC It seems to work as I can see iDOC, but be in a failed status. Thanks for all your answers, the settings mentioned are already maintained and I checked all queques for errors. . Planning is created – plan lines and complete the transaction – /SAPAPO/PWBSCH1, create the version. In the « Partners » tab in external acquisition base data, I changed the media to « XML » and I can see a failed IDOC.

Please check if you have assigned sharing profiles, then check if a profile is maintained to stop the SA version. Here`s the way: SPRO (APO) >Supply Chain Planning > Collaborative Supply > Supply Scheduling Agreement > Maintain SA Release Creation Profile. Please check the following setting in the customizing (SPRO) in the APO system If you have an answer to this question, instead use the form of your answer at the bottom of the page. Integration with SAP Components->Integration via APO Core Interface (CIF) > Basic principles for data transmission >publication > manage distribution definition Then I went to external acquisition base data and clicked on SA Release and executed calendar line. You already have an active moderator warning for this content. 4) Check for sysfails and try to take corrective action. . I created qty in the operational horizon and I released it for ECC, it worked. . Appendixes: Up to 10 attachments (including images) can be used with a maximum of 1.0 Mb and a total of 10.5 Mb. . If I arrive losrelease, I can see the status in green, so consider that the sharing profile is maintained correctly.

No Comments

Sorry, the comment form is closed at this time.